
全國(guó)服務(wù)熱線: 0512-6768 8999

有軌電車(chē)業(yè)績(jī)
一、京車(chē)100%低地板現(xiàn)代有軌電車(chē)項(xiàng)目牽引系統(tǒng)
Traction System of BSR 100% Low-floor Modern Tram Project
項(xiàng)目概況:
京車(chē)100%低地板現(xiàn)代有軌電車(chē)采用五模塊編組,1C2M控制,車(chē)長(zhǎng)33.5米,車(chē)體寬2.65米,高3.6米,滿載定員380人。2014年10月,江蘇經(jīng)緯軌道交通設(shè)備有限公司為北京地鐵車(chē)輛裝備公司提供該項(xiàng)目包括齒輪箱及聯(lián)軸節(jié)的全套牽引、輔助和列車(chē)網(wǎng)絡(luò)控制系統(tǒng)。
Project Overview:
Name of line: BSR 100% Low-floor Modern Tram Project
Length of the vehicle: 33.5m
Marshalling: 5 cars
Width of vehicle: 2.65m
Height of vehicle: 3.6m
Full load capacity: 380 passengers
Scope of supply: full traction, auxiliary and network control system including gearbox and couplings
Vehicle manufacturer: Beijing Metro Vehicle Equipment Co., Ltd.
Traction and Control system manufacturer: Jiangsu Kingway Transportation Co., Ltd.
產(chǎn)品一覽:
Product overview:

牽引變流器
VVVF

牽引蓄電池箱
Traction Battery Box

蓄電池充電機(jī)
Battery Charge Box

高壓箱
HV Box

牽引電機(jī)
Traction Motor

有軌電車(chē)列車(chē)控制系統(tǒng)方案
Control System Solution
二、青島市城陽(yáng)區(qū)現(xiàn)代有軌電車(chē)項(xiàng)目牽引系統(tǒng)
Traction System of Qingdao Chengyang Modern Tram Project
項(xiàng)目概況:
青島市城陽(yáng)區(qū)現(xiàn)代有軌電車(chē)項(xiàng)目線路全長(zhǎng)約8公里,共設(shè)12站,全部為地面線。該項(xiàng)目屬于國(guó)內(nèi)首采用獨(dú)立輪永磁電機(jī)直驅(qū)(無(wú)齒輪箱)和鉸接式轉(zhuǎn)向架獨(dú)特設(shè)計(jì)兩項(xiàng)技術(shù)的示范線。江蘇經(jīng)緯軌道交通設(shè)備有限公司為中車(chē)青島四方機(jī)車(chē)車(chē)輛股份有限公司提供7列車(chē)整套牽引和輔助系統(tǒng),已于2015年7月全部交付。
Project Overview:
Name of line: Qingdao Chengyang modern tram line
Number of wayside stops: 12
Technical highlight: the first manufacturer using two distinctive designs of independent-wheel direct drive PMSM without gearbox and articulated bogie as demonstration line with advanced technology
Scope of supply: 7 train sets of complete traction and auxiliary system
Vehicle manufacturer: CRRC Qingdao Sifang Rolling Stock Co., Ltd.
Traction and Control system manufacturer: Jiangsu Kingway Transportation Co., Ltd.
產(chǎn)品一覽:
Product overview:

牽引變流器
VVVF Box

輔助變流器
SIV Box

三項(xiàng)永磁同步電機(jī)
PMSM Motor
三、蘇州市高新區(qū)現(xiàn)代有軌電車(chē)2號(hào)線項(xiàng)目牽引系統(tǒng)
Traction System of Suzhou New District Tram Line 2 Project
項(xiàng)目概況:
蘇州市高新區(qū)現(xiàn)代有軌電車(chē)2號(hào)線線路全長(zhǎng)約18.5公里,車(chē)輛采用五模塊編組,1C1M控制。江蘇經(jīng)緯軌道交通設(shè)備有限公司為南京中車(chē)浦鎮(zhèn)城軌車(chē)輛有限責(zé)任公司提供18列車(chē)的配套牽引系統(tǒng),南京中車(chē)浦鎮(zhèn)城軌車(chē)輛有限責(zé)任公司為蘇州高新有軌電車(chē)有限公司提供相應(yīng)車(chē)輛。
Project Overview:
Name of line: Suzhou new district tram line 2
Length of the line: 18.5km
Marshalling: 5 cars (1C1M)
Scope of supply: 18 train sets of traction system
Vehicle manufacturer: Nanjing Puzhen Vehicle Co., Ltd.
Traction and Control system manufacturer: Jiangsu Kingway Transportation Co., Ltd.
產(chǎn)品一覽:
Product overview:

牽引變流器
VVVF Box

牽引電機(jī)
Traction Motor
四、佛山市南海區(qū)現(xiàn)代有軌電車(chē)項(xiàng)目牽引系統(tǒng)
Traction System of Foshan Nanhai Modern Tram Project
項(xiàng)目概況:
佛山市南海區(qū)現(xiàn)代有軌電車(chē)項(xiàng)目線路全長(zhǎng)約13.5公里,共設(shè)13站。該項(xiàng)目延續(xù)青島城陽(yáng)線有軌電車(chē)項(xiàng)目中采用的牽引系統(tǒng),采用獨(dú)立輪永磁電機(jī)直驅(qū)(無(wú)齒輪箱)和鉸接式轉(zhuǎn)向架獨(dú)特設(shè)計(jì)。江蘇經(jīng)緯軌道交通設(shè)備有限公司為中車(chē)青島四方機(jī)車(chē)車(chē)輛股份有限公司提供16列車(chē)整套牽引和輔助系統(tǒng)。
Project Overview:
Name of line: Foshan Nanhai Modern Tram line
Length of the line: 13.5km
Number of wayside stops: 13
Technical highlight (the same as Qingdao Chengyang Tram Project): the first manufacturer using two distinctive designs of independent-wheel direct drive PMSM without gearbox and articulated bogie as demonstration line with advanced technology
Scope of supply: 16 train sets of traction system
Vehicle manufacturer: CRRC Qingdao Sifang Rolling Stock Co., Ltd.
Traction and Control system manufacturer: Jiangsu Kingway Transportation Co., Ltd.
產(chǎn)品一覽:
Product overview:

牽引變流器
VVVF Box

輔助變流器
SIV Box

三項(xiàng)永磁同步電機(jī)
PMSM Motor
五、蘇州市高新區(qū)現(xiàn)代有軌電車(chē)1號(hào)線延長(zhǎng)線項(xiàng)目牽引系統(tǒng)
Traction System of Suzhou New District Modern Tram Extension Line 1 Project
項(xiàng)目概況:
蘇州市高新區(qū)現(xiàn)代有軌電車(chē)1號(hào)線延長(zhǎng)線全長(zhǎng)約10.2公里,共設(shè)8個(gè)車(chē)站,車(chē)輛采用三模塊編組,1C1M控制。江蘇經(jīng)緯軌道交通設(shè)備有限公司為南京中車(chē)浦鎮(zhèn)城軌車(chē)輛有限責(zé)任公司提供9列車(chē)的配套牽引系統(tǒng),南京中車(chē)浦鎮(zhèn)城軌車(chē)輛有限責(zé)任公司為蘇州高新有軌電車(chē)有限公司提供相應(yīng)車(chē)輛。
Project Overview:
Name of line: Suzhou new district tram extension line 1
Length of the line: 6.5km
Marshalling: 3 cars (1C1M)
Scope of supply: 9 train sets of traction system
Vehicle manufacturer: Nanjing Puzhen Vehicle Co., Ltd.
Traction and Control system manufacturer: Jiangsu Kingway Transportation Co., Ltd.
產(chǎn)品一覽:
Product overview:

牽引變流器
VVVF Box

牽引電機(jī)
Traction Motor